Skip to content
Build · 01.1

The website your company is judged by.

Most people see your site before they talk to anyone. It has to make the argument, prove it, load fast enough to keep visitors, and stay easy for your team to edit.

Build
01 / When

When this is the right project.

Check which situations apply today.

If two or more sound familiar, it’s time.

  • 01

    Your positioning changed

    You sell something new, or to a new audience, but the site still makes the old case.

  • 02

    The site is slow or unmanageable

    Every change needs a developer, and maintenance eventually costs more than a replacement.

  • 03

    You're invisible to the new search

    You rank reasonably well but never appear in AI-generated answers, because your content lacks structure.

  • 04

    You're about to launch

    Building it right the first time is cheaper than retrofitting a site that grew page by page.

02 / Included

What a marketing site includes.

Everything is in the quote. Nothing is sold as an add-on.

Content model first

Typed page templates with defined fields, for long-term consistency.

Design system

Type, spacing, color and components, so every new page fits.

A CMS your team runs

Editing without a developer, plus a training session and written docs at handover.

Performance budget

An agreed target, measured on real devices and checked before each release.

Structured data

Schema generated from the content, so it never drifts from the page.

Redirects and continuity

On a rebuild, the URLs that bring traffic keep working.

03 / What to watch

Where marketing sites usually go wrong.

Each risk, and how we avoid it.

×One-off pages leave no home for unplanned content.
Page types are defined before design.
×The CMS is either too loose (it breaks the design) or too rigid (you can't publish).
Fields have clear limits: freedom in the content, not in the layout.
×The design looks right on a big monitor but breaks on phones.
Every page is checked on real devices before design approval.
×Content is written last and forced into existing boxes.
Real content is used from the first sketch.
×Analytics arrive a week after launch.
Analytics are verified on launch day.
04 / How it works

How it works.

How we usually work. The quote sets the actual dates.

  1. Weeks 1–2

    Scope

    Define the audience, core message and key pages, and map the content model before design. Deliverables: scope document; sitemap and content model.

  2. Weeks 3–4

    Design

    Key pages first, then the design system. Deliverables: design system; page designs.

  3. Weeks 5–9

    Build

    Front end and CMS built in parallel on a preview URL. Deliverables: staging site; weekly progress notes.

  4. Week 10

    Launch

    Content loaded, redirects mapped, analytics verified, performance and accessibility checked. Deliverables: live site; launch checklist.

05 / Questions

Questions we get asked

Most have 8 to 25. Cost depends more on the number of distinct page types than on the page count.

Tell us what you need built.

Describe the project in a few lines. We'll reply with a plan, a timeline and a fixed quote.